Top 4 Rookie Infill Development Mistakes

The Real Estate Espresso Podcast

5m
Transcript

Original podcast

Summary

Written by a model from the transcript; not yet reviewed.

This episode of the Real Estate Espresso Podcast examines the top four rookie mistakes newer investors make in infill development. The host, Victor Manash, explains that while developing in established neighborhoods seems less risky than greenfield sites, hidden below-surface and structural issues can destroy a project budget. The discussion covers geotechnical risks, municipal servicing capacity constraints, gravity drainage challenges requiring costly lift stations, and complex site topography needing expensive retaining walls. By detailing real-world costs like a three-quarter-million-dollar sewer lift station, the host argues that thorough due diligence before construction begins is essential to avoiding massive, budget-breaking surprises.

  • Conduct geotechnical investigations early in due diligence to uncover costly soil and foundation surprises. 1:58
  • Verify actual municipal water and sewer capacity rather than assuming it exists for multi-unit buildings. 2:12
  • Check sewer gravity drainage geometry carefully to avoid expensive lift stations that can cost hundreds of thousands. 3:03
  • Analyze detailed topographic surveys to spot elevation changes that require costly retaining walls and flat driveways.

Highlights

  • 0:39

    Geotechnical Risk in Infill Developmentinsight

    Unseen subsurface conditions like organic fill, expansive clay, or bedrock can dramatically change foundation designs and increase construction budgets.

  • 2:12

    False Assumptions on Municipal Servicesinsight

    Existing single-family home hookups do not mean the city water and sewer infrastructure can handle larger multi-unit fire suppression and domestic demands.

  • 3:03

    Gravity Drainage and Lift Stationsdata

    If sewer lines cannot be gravity-fed, developers face installing expensive lift stations that easily cost hundreds of thousands of dollars.

  • 3:40

    High Cost of Sewer Lift Stationsdata

    A sewer lift station for a 104-townhouse project costs three-quarters of a million dollars, showing why this must not be glossed over.

  • 4:33

    Expensive Retaining Wallsstrategy

    Creating flat frontages and level driveways often requires building expensive retaining walls with engineered foundations, drainage, and waterproofing.

Quotes

  • “The difference can be hundreds of thousands of dollars.”
    Unnamed speaker · 1:19
  • “That's why the geotech investigation's got to be one of the earliest things that you focus on in due diligence.”
    Unnamed speaker · 1:58
  • “Even a modestly sized sewer lift station can easily cost a quarter million dollars.”
    Unnamed speaker · 3:40
  • “Those retaining walls are not just concrete walls holding back the dirt. They could be providing engineered foundations, drainage and waterproofing for the entire site.”
    Unnamed speaker · 4:37

About this episode

Some of the most expensive mistakes in infill development happen before construction even begins. They're often made by relatively inexperienced investors who assume that because something exists, it must be suitable for their proposed development. Today we're examining four of the biggest risks that can turn an apparently profitable infill project into a financial disaster. The first, and arguably most important, is geotechnical risk. The soil stability can determine whether you can build, or face hundreds of truckloads of export and import to replace the soil on the property. 2. Municipal servicing capacity. One of the most dangerous assumptions in infill development is that because water and sewer services exist in the street, adequate capacity must be available. That is simply not true. An existing single-family home might have a modest water connection and a sanitary sewer lateral designed for a single household. Replacing that house with twenty apartments creates an entirely different demand profile. The municipal water main might not have sufficient capacity to meet the domestic water requirements and fire protection demands of the proposed building. 3. The geometry of the sanitary sewer system. Sewer systems generally rely on gravity. Wastewater flows downhill through pipes installed at carefully designed slopes. For gravity drainage to work, the elevation of the sewer connection must be sufficiently low relative to the building's drainage outlets. 4. Site topography The developer wants to maximize the building footprint while maintaining parking, access, and landscaping. The building needs a level foundation, but the surrounding ground is anything but level. Suddenly, retaining walls become necessary, and retaining walls are not simply concrete walls holding back dirt. Depending on their height and location, they may require engineered foundations, drainage systems, waterproofing, reinforcement, and special construction techniques. ------------- **Real Estate Espresso Podcast:** Spotify: [The Real Estate Espresso Podcast](https://open.spotify.com/show/3GvtwRmTq4r3es8cbw8jW0?si=c75ea506a6694ef1) iTunes: [The Real Estate Espresso Podcast](https://podcasts.apple.com/ca/podcast/the-real-estate-espresso-podcast/id1340482613) Website: [www.victorjm.com http://www.victorjm.com/](http://www.victorjm.com http://www.victorjm.com/) LinkedIn: [Victor Menasce](http://www.linkedin.com/in/vmenasce) YouTube: [The Real Estate Espresso Podcast](http://www.youtube.com/@victorjmenasce6734) Facebook: [www.facebook.com/realestateespresso](http://www.facebook.com/realestateespresso) http://www.facebook.com/realestateespresso%5D(http://www.facebook.com/realestateespresso) Email: [[email protected] mailto:[email protected]](mailto:[email protected] mailto:[email protected]) **Y Street Capital:** Website: [www.ystreetcapital.com http://www.ystreetcapital.com/](http://www.ystreetcapital.com http://www.ystreetcapital.com/) Facebook: [www.facebook.com/YStreetCapital](https://www.facebook.com/YStreetCapital) http://www.facebook.com/YStreetCapital%5D(https://www.facebook.com/YStreetCapital) Instagram: [@ystreetcapital](http://www.instagram.com/ystreetcapital)

Transcript

0:00
5:18

1,025 words · 1 speaker

Topics

  • Infill Development
  • Real Estate Investing
  • Due Diligence
  • Geotechnical Engineering
  • Municipal Infrastructure
  • Construction Costs