Pod Insights The Real Estate Espresso Podcast AMA - Breakthrough Construction Technologies? About this episode Today is another AMA episode (Ask Me Anything). Our question comes from Steve who asks: " What is the next potential technology that could dramatically change or revolutionize construction?"-------------**Real Estate Espresso Podcast:** Spotify: [The Real Estate Espresso Podcast](https://open.spotify.com/show/3GvtwRmTq4r3es8cbw8jW0?si=c75ea506a6694ef1) iTunes: [The Real Estate Espresso Podcast](https://podcasts.apple.com/ca/podcast/the-real-estate-espresso-podcast/id1340482613) Website: [www.victorjm.com](http://www.victorjm.com) LinkedIn: [Victor Menasce](http://www.linkedin.com/in/vmenasce) YouTube: [The Real Estate Espresso Podcast](http://www.youtube.com/@victorjmenasce6734) Facebook: [www.facebook.com/realestateespresso](http://www.facebook.com/realestateespresso) Email: [[email protected] ](mailto:[email protected] ) **Y Street Capital:** Website: [www.ystreetcapital.com](http://www.ystreetcapital.com) Facebook: [www.facebook.com/YStreetCapital](https://www.facebook.com/YStreetCapital) Instagram: [@ystreetcapital](http://www.instagram.com/ystreetcapital)
Transcript 0:01 Speaker 00 Welcome to the Real Estate Espresso Podcast, your morning shot of what's new in the world of real estate investing. I'm your host Victor Manash. Today's show is another AMA episode, that is Ask Me Anything. I love to answer your questions and if you have a question you think is going to be of broad interest, send it in. I'll answer it live on the air. Send your questions to [email protected] . That's [email protected] . Today's question comes from Steve who asks, "What is the next potential technology that could dramatically change or revolutionize construction?" Well Steve, this is a great question. There's a lot of innovations in construction that are being promoted as the next greatest thing. The problem with many of these is that they're often focused on solving a small portion of the construction problem. For example, there are the mass
0:44 Speaker 00 timber folks who advocate using engineered wood assemblies to build very tall buildings. There's a handful of examples of these 10 and 12-story buildings, but they don't really save that much in terms of cost and they don't offer many real advantages compared with steel or concrete. And while they may save a little money in construction, because they're considered a combustible structure, they actually cost more over the long haul in terms of insurance. There are the 3D-printed homes that use a robot to dispense concrete onto the site to assemble the framing of a house in concrete. Somehow, these are supposed to speed things up and save costs, but the speed and framing often neglects the extensive setup time for the 3D printer. You see, many of the technologies are not taking a holistic perspective when it comes to the entirety of the construction process. There's like-age
1:28 Speaker 00 structural steel. This too offers many advantages, especially if it can be built in a factory environment. There are sandwich insulated panels. There's a few of these technologies available, including steel sandwich panels and engineered wood sandwich panels. But these are all just framing technologies. You can frame a building pretty quickly, but then if you need to bring extra equipment on-site to install windows and attach exterior cladding, then the time to complete multiplies. If you still need to install the fire barriers required by the building code before you pull wire, install mechanical and plumbing, then the savings are going to be undermined. You see, the construction process involves anywhere between 17 to 22 subcontractors.
2:10 Speaker 00 Each of them involved in the construction of a building. They generally don't talk to each other. The key, in my opinion, is to eliminate subcontractors altogether and to collapse steps that would have been traditionally performed by separate subcontractors. The more you can do in a factory environment, when you're working on the ground level, the better. The key, in my opinion, consists of understanding the interplay between the conflicting requirements under the building code and optimizing the complete assembly process, not just framing. If you've ever taken the time to watch a time-lapse video of how a modern cruise ship gets put together, it might give you a clue as to how this assembly process can be streamlined. Cruise ships are assembled by hoisting completed modules into place that have been built in a separate factory environment.
2:54 Speaker 00 Imagine for a moment that you have a single tower crane on a construction site for a high-rise building. You see these often. That single crane represents a bottleneck in the construction process. Everyone is waiting, looking up at the sky for the next load of concrete or the next load of materials to be hoisted from the ground level up to where it's needed. You want to be thinking about eliminating those bottlenecks and optimizing the use of those critical resources. The key in optimizing construction is not necessarily it's a new technology, it's a new way of thinking. If you can eliminate steps in the construction process, then the savings in labor can be significant, and if you can reduce the number of individual pieces that need to be transported on the construction site to their final location, the savings can be huge.
3:37 Speaker 00 Imagine for a moment that a single wall assembly consists of, let's say, thirty pieces of lumber, four sheets of plywood, two tubes of glue, and five hundred nails. If you have to carry each of those items to the place where the wall is going to be built, then build the wall, then tilt it into place, it's a lot more effort compared with having a robot assemble that wall panel in a factory environment and then a single lifting operation is required to erect the wall panel into place. It's a simple example, but if that wall panel also includes the rigid foam insulation, and the windows, and the rain screen, and the flashing, and the moisture barrier, and all gets done and put up in one step, then the savings are huge. You see, the factory environment doesn't require unionized labor, whereas the construction site might require that based on your jurisdiction. We need to think about the process In terms of eliminating steps in the overall construction.
4:23 Speaker 00 So for example, if you need formed concrete, you might want to consider a technology that makes the forms permanent and part of the structure. If the concrete slabs can be erected without shoring, then you can save several steps. The problem is that architects tend to think of each building as unique and each element of the building should be unique to reflect the unique style of the owner. Well, you can still create unique designs while taking the volume manufacturing approach to design. We call this DFAM or Design for Manufacturing Ability. So many buildings are built in North America using the traditional forced air ductwork. Another example. It requires a lot of sheet metal, fire dampers, extra insulation, multiple layers of fire barrier, bulkheads, and the list goes on and on. These systems degrade the soundproofing between rooms
5:08 Speaker 00 and they allow cooking smells to propagate throughout a home or apartment. There are days of labor spent forming sheet metal and hanging it and installing fire dampers. European-style mini-split systems have the advantage that you're running a quarter-inch copper tube through the walls between the two halves of the heat pump system. It gives you individual temperature control per room and eliminates the bulkheads. Some exterior cladding systems require sending someone up the side of the building in a genie lift or a pump jack to caulk all of the seams. That's an extra step. That might need to be redone every five to seven years. Choosing a system that doesn't need caulking at all would be the preferred method. You see, architects have a tendency to throw the design over the wall and that general contractor figure out how to put it together.
5:52 Speaker 00 The shop drawings are almost an afterthought. But an architect who adopts a manufacturing system that yields breakthrough efficiency in the construction process and is willing to design within the constraints of that system could yield a building that's built in a fraction of the time and a fraction of the cost. I want to thank you, Steve, for a fantastic question and for the listeners at home, have an awesome rest of your day. Go make some great things happen. We'll talk to you again tomorrow.
Previous Are You Becoming Invisible? Next Midwest Investing with Joseph Root Page updated November 15, 2026 · transcript and summary are machine-generated